Technology And Equipment

With accumulated technical expertise and specialized facilities
We provide optimal gas solutions.

Production Facilities

Human error prevention

Modern Co., Ltd.’s gas production and filling panel is marked to clearly indicate the flow of gas, and it is easy to verify which gas is opened or closed by operating which valve, thereby preventing accidents caused by producer error.

Human Error Prevention 1 Human Error Prevention 2 Human Error Prevention 3 Human Error Prevention 4

Automation

The liquefied carbon dioxide filling device was semi-automated by installing an air vise to utilize the recovered carbon dioxide, and all equipment was equipped with vacuum piping to reduce losses during the filling of liquefied argon, nitrogen, and oxygen LGCs. The argon LGC filling station was equipped with automatic valve openers to reduce filling losses and improve productivity.

Liquid Carbon Dioxide Filling Equipment

Liquefied Carbon Dioxide Filling Equipment 1 Liquefied Carbon Dioxide Filling Equipment 2 Liquefied Carbon Dioxide Filling Equipment 3

Liquefied gas filling facility

Liquefied gas filling facility 1 Liquefied gas filling facility 2 Liquefied gas filling facility 3

Gas filling facility

We have equipped a separate bundle-dedicated filling station for the mass production of Modern's flagship products, helium and argon gases and mixed gases based on them.
We have introduced and installed the first vertically moving bundle charging station in Korea for convenient bundle loading and unloading and safety.

Tank filling facility

Tank Filling Facility 1 Tank filling facility 2 Tank filling facility 3

Bundle charging facility

Bundle Charging Facility 1 Bundle Charging Facility 2 Bundle Charging Station 3

Gas filling facility

Gas filling facility 1 Gas filling facility 2 Gas filling facility 3

Gas cylinder storage room

Gas Cylinder Storage Room 1 Gas Cylinder Storage Room 2